admin

April 18, 2022
Welded Shipping Supports

Specialty Shipping Supports

DESTINATION: New Mexico TIME TO COMPLETION: Two days to design to fabricate Teamed up with Billy Blocks, we created these specialty shipping supports which were fabricated […]
April 12, 2022

Propane Unloading Dock

LOCATION: DATE: Shop fabrication of a 28 car propane unloading dock for a large export facility on the west coast.
March 23, 2022
Inlet Header for large Industrial Complex

Inlet Header for large Industrial Complex

LOCATION: DATE: Custom Walkways for Moduline
March 23, 2022
Custom Fabricated Truck Body Dirty Ducts

Custom Fabricated Truck Body

LOCATION: DATE: Dirty Ducts
March 23, 2022
Custom Walkways for Moduline

Custom Walkways for Moduline

LOCATION: DATE: Custom Walkways for Moduline
March 23, 2022
Category H Steam Coil Fabrication

Category H Steam Coil Fabrication

LOCATION: DATE: Shielded Metal Arc Welding (SMAW) a Category H Steam Coil Fabrication which was part of a project consisting of 600 feet of two inch pipe. https://hranco.com/wp-content/uploads/2022/03/20220218_154914_2.mp4
March 16, 2022
Custom Fabricated Flare Tower for Oil and Gas

Custom Fabricated Flare Tower for Oil and Gas

LOCATION: DATE: Custom fabricated Flare Tower for an Oil and Gas client.
March 16, 2022
Plasma Cut Steel plates

Plasma Cut Steel plates

LOCATION: DATE: Steel plates cut with precision by our Plasma Cutter.
March 16, 2022
Specialized Custom Fabricated Pipe Barge

Specialized Custom Fabricated Pipe Barge

LOCATION: OILSANDS TAILINGS PONDDATE: Specialized Custom Fabricated Pipe Barge for Oilsands Tailings Pond